Sign In | Join Free | My myecer.com
China Qingdao KaFa Fabrication Co., Ltd. logo
Qingdao KaFa Fabrication Co., Ltd.
Proud of helping steel structure solutions
Verified Supplier

7 Years

Home > Steel Structure Workshop >

Pre-Engineer Construction Design Steel Frame Workshop steel buildings

Qingdao KaFa Fabrication Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Pre-Engineer Construction Design Steel Frame Workshop steel buildings

Brand Name : KAFAFAB

Model Number : Steel workshop

Certification : BV,SGS

Place of Origin : Qingdao, China

MOQ : 1000 square meter

Price : USD 25-80 per square meter

Supply Ability : 20,000 square meter per month

Delivery Time : 4-6 weeks after deposit and shop drawing

Packaging Details : Nude packing or steel pallet

Material : Hot rolled H beam, Steel plate, Angle steel Etc.

Grade : Q355B&Q235B

Paint : Epoxy rich zinc primer, DFT 125μm

Blasting grade : Sa 2.5

Wall : Color steel sheet

Roof : Color steel sheet

Earthquake resistant : 8.0 grade

Drainage system : Outer&inner gutter with down pipe

Contact Now


Pre-engineer Construction Design Steel Frame Prefab Steel Structure Workshop

Project name: LT77 warehouse building

Client: BOMA GROUP

Content: Structural steel, cladding, windows, doors etc.

Quantity: 1500sqm warehouse + 240sqm office

Total value: USD 158,000

Description: Colorbond sheet 0.5mm thickness

Pre-Engineer Construction Design Steel Frame Workshop steel buildings

Compared with traditional buildings, steel structure building is a new building structure—the entire building made of steel. The structure mainly comprises steel beams, columns, trusses, and other parts made of thin-walled steel and steel plates. It is connected between parts and parts by welding, bolts, or rivets. The lightweight and simple structures are widely used in large factories, stadiums, super high-rise buildings, and other fields.

Steel Structure Building provides affordable, durable, and low-maintenance solutions for workshops, warehouses, agricultural buildings, garage buildings, and aircraft hangars. Compared to wooden structures, steel is resistant to strong winds, heavy snow, and termites. The interior layout of the metal buildings can be fully customized to meet your needs.

>> Prefabricated steel structure building parameters:

Main Steel
Steel Beam Column Q235B,Q355B
Secondary Steel
Tie Bar Q235B
Purlin C and Z purlin
Bracing Q235B
Accessories
Surface Painted or Hot Dip Galvanized
Door Rolling Up Door or Sliding Door
Window PVC or Aluminum Alloy
Roof and Wall Panels

Corrugated Steel Sheet, EPS Sandwich Panel, Rock Wool Sandwich

Panel, PU Sandwich Panel

Others
Service Design, Fabrication and Installation
We can offer quotations according to customers’ drawings and requirements,free design drawings and detailed installation drawings.
Design software: Auto CAD,PKPM,MTS,3D3S, TArch, Tekla Structures(X steel)V12.0, etc.
Packing According to customers’ requirements

Pre-Engineer Construction Design Steel Frame Workshop steel buildings

Pre-Engineer Construction Design Steel Frame Workshop steel buildings

>> Features and services:

  • Short construction time

The most significant advantage of the steel building is that all components are prefabricated at the factory ​​and installed on-site. It only takes about two months for a small industrial workshop.

  • Anti-seismic performance

The steel building is a flexible structure and light in weight. It can effectively reduce the seismic response and the impact of the disaster, which is exceptionally beneficial to earthquake .

  • Suitable for relocation

Once the owner is dissatisfied with the site or unexpected changes in the external environment, the entire steel structure building can demolish in a short period with minimal losses.

>>Factors affecting the price of steel structure Building:

1. Raw material prices
Fluctuations in the price of steel have an important impact on the price of steel structure buildings. The increase in steel prices will directly cause the overall price of steel structure buildings to rise.

2. External load
External loads include wind load, snow load, dead load, and live load. Structural engineers calculate the steel structure based on the external load. If the load is large, the amount of steel used in the structure will increase.

3. The span of the steel frame
The larger span of the steel frame, the greater the amount of steel used per steel frame. More than 30 meters is considered a large width. If the steel frame has a large span and no center pillar, the amount of steel used will increase.

4. Structure
For steel structure buildings with cranes or mezzanine floors, to ensure the safe operation of cranes, steel columns will be increased, and columns of an equal cross-section will be adopted, which will increase the amount of steel used in the building.

Conclusion:
The amount of steel used plays a vital role in steel structure buildings. Therefore, structural engineers must optimize the structure as much as possible during the design process while ensuring safety, reducing the amount of steel used, and saving costs.

Pre-Engineer Construction Design Steel Frame Workshop steel buildings


Product Tags:

steel building workshop

      

prefab steel workshop

      
 Pre-Engineer Construction Design Steel Frame Workshop steel buildings Manufactures

Pre-Engineer Construction Design Steel Frame Workshop steel buildings Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KaFa Fabrication Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)